{"$schema": "https://iptc.org/std/ninjs/ninjs-schema_3.2.json", "uri": "urn:newsml:wireva.mib.news:item:175e7c89-00d6-416b-a66a-2e4f4e0ffde3", "type": "text", "profile": "standard", "version": "1", "versioncreated": "2026-09-01T16:08:34.233739Z", "firstcreated": "2026-09-01T16:05:08.120516Z", "pubstatus": "usable", "urgency": 5, "language": "en", "headline": "Temporary power interruptions part of geothermal integration, officials say", "byline": "Althea Shillingford", "located": "DM", "copyrightholder": "Haydamax OÜ", "copyrightnotice": "Wireva / Dominica 1", "usageterms": "Subscribers may republish this item in full, including translation and trimming, with the credit “Wireva / Dominica 1”. Set rel=canonical to https://dominica1.com/news/temporary-power-interruptions-part-of-geothermal-integration-officials-say/ when publishing on the web.", "description_text": "Dominica's recent power interruptions are part of testing and commissioning work to integrate geothermal energy into the national grid, according to energy officials.", "altids": {"mosaic": "175e7c89-00d6-416b-a66a-2e4f4e0ffde3", "story": "d8afb89b-b566-4c21-8635-902d8fd35e1f", "slug": "temporary-power-interruptions-part-of-geothermal-integration-officials-say"}, "subject": [{"name": "General news", "rel": "direct", "literal": "general", "code": "medtop:11000000", "scheme": "http://cv.iptc.org/newscodes/mediatopic/", "uri": "http://cv.iptc.org/newscodes/mediatopic/11000000"}], "place": [{"name": "DM", "literal": "dm", "code": "DM", "scheme": "http://cv.iptc.org/newscodes/countrycodes/"}], "person": [], "organisation": [], "genre": [{"name": "Standard story", "literal": "standard"}], "service": [{"name": "Wireva", "literal": "wireva"}], "associations": {"featuremedia": {"uri": "urn:newsml:wireva.mib.news:media:a4b51415-4223-4dec-a049-1668f4262143", "type": "picture", "version": "1", "pubstatus": "usable", "headline": "Third Police Officer arrested as investigations continue in the death of 16-year-old Jerbiah Paul", "description_text": "Third police officer charged in Jerbiah Paul death investigation", "copyrightholder": "en.wikipedia.org", "copyrightnotice": "Dominica", "usageterms": "File-level licence not yet resolved from Commons; fetch the original for exact terms.", "altids": {"wireva": "a4b51415-4223-4dec-a049-1668f4262143"}, "extra": {"wireva:delivery_mode": "preview_and_link", "wireva:rights": {"licence": "Wikimedia — licence per file", "licence_url": "https://commons.wikimedia.org/wiki/Commons:Reusing_content_outside_Wikimedia", "licence_raw": "Wikipedia page image", "licence_verified_at": "2026-09-02T04:08:34.137231Z", "attribution_required": true, "attribution_text": "Dominica", "redistribution_allowed": false, "commercial_use_allowed": false, "modifications_allowed": false, "share_alike_required": false}, "wireva:provenance": {"creator": "", "source_name": "en.wikipedia.org", "source_url": "https://en.wikipedia.org/wiki/Dominica", "source_page_url": "https://en.wikipedia.org/wiki/Dominica", "our_page_url": "https://dominica1.com/news/fourth-police-officer-charged-in-jerbia-paul-murder-investigation/"}, "wireva:role": "lead"}, "renditions": {"preview": {"href": "https://nbg1.your-objectstorage.com/ckln/image-assets/13ea657c8b669264167c38ad0cb1ca23e3dfb6a2020c088a7daabb339cd336c0.jpg", "mimetype": "image/jpeg", "width": 1280, "height": 640}, "source": {"href": "https://en.wikipedia.org/wiki/Dominica", "mimetype": "image/jpeg"}}}}, "extra": {"wireva:story": {"uri": "urn:newsml:wireva.mib.news:story:d8afb89b-b566-4c21-8635-902d8fd35e1f", "slug": "temporary-power-interruptions-part-of-geothermal-integration-officials-say-20260901", "status": "developing", "languages": ["en"], "item_count": 1, "is_breaking": false}, "wireva:rights": {"class": "agency_original", "redistribution_allowed": true, "commercial_use_allowed": true, "modifications_allowed": true, "share_alike_required": false, "attribution_required": true, "attribution_text": "Wireva / Dominica 1", "canonical_required": true, "canonical_url": "https://dominica1.com/news/temporary-power-interruptions-part-of-geothermal-integration-officials-say/", "linkback_required": true, "licence": "Wireva subscriber licence", "licence_url": "", "licensor": "Haydamax OÜ", "valid_until": null, "excerpt_max_chars": 0, "decided_by_rule": "agency_original_verified", "needs_review": false}, "wireva:provenance": {"production_method": "automated", "ai_stages": {"editing": true, "drafting": true, "headline": true, "discovery": true, "classification": true, "image_selection": true, "source_collection": true, "cross_source_comparison": true}, "model": "", "human_reviewed": false, "reviewed_by": "", "reviewed_at": null, "editorial_control": true, "editorial_responsibility": "Haydamax OÜ (Wireva)", "factchecked": false, "verification_status": "multi_source", "independent_confirmations": 1, "official_source_used": false, "used_press_release": false, "public_interest": true, "ai_disclosure_required": true, "ai_disclosure_text": "This item was produced with AI assistance under the editorial responsibility of Haydamax OÜ.", "independence_check": {"status": "passed", "score": 0.159, "checked_at": "2026-09-01T16:08:34.246603Z"}}, "wireva:publication": {"name": "Dominica 1", "domain": "dominica1.com", "country": "DM", "url": "https://dominica1.com/news/temporary-power-interruptions-part-of-geothermal-integration-officials-say/"}, "wireva:links": {"self": "https://wireva.mib.news/api/v1/items/175e7c89-00d6-416b-a66a-2e4f4e0ffde3", "html": "https://wireva.mib.news/item/175e7c89-00d6-416b-a66a-2e4f4e0ffde3/temporary-power-interruptions-part-of-geothermal-integration-officials-say/", "story": "https://wireva.mib.news/story/temporary-power-interruptions-part-of-geothermal-integration-officials-say-20260901/"}, "wireva:metrics": {"word_count": 518, "char_count": 3843, "reading_time_seconds": 274}}}