{"$schema": "https://iptc.org/std/ninjs/ninjs-schema_3.2.json", "uri": "urn:newsml:wireva.mib.news:item:8581536e-f30b-4608-8421-d9f96dcbeabf", "type": "text", "profile": "update", "version": "1", "versioncreated": "2026-11-09T13:00:42.521060Z", "firstcreated": "2026-11-09T12:22:38.508000Z", "pubstatus": "usable", "urgency": 5, "language": "ro", "headline": "Linia electrică Vulcănești–Chișinău a fost pusă sub tensiune", "byline": "", "located": "Moldova", "copyrightholder": "Haydamax OÜ", "copyrightnotice": "Wireva / Cronica Moldovei de Azi", "usageterms": "Subscribers may republish this item in full, including translation and trimming, with the credit “Wireva / Cronica Moldovei de Azi”. Set rel=canonical to https://cronicamoldovei.com/economie/linia-electrica-vulcanesti-chisinau-a-fost-pusa-sub-tensiune/ when publishing on the web.", "description_text": "Linia electrică aeriană de 400 kV Vulcănești–Chișinău, cu o lungime de peste 150 de kilometri, a fost inaugurată duminică, în prezența președintei Maia Sandu și a comisarei europene Marta Kos. Infrastructura permite transportul energiei din România și de pe piața europeană către centrul țării.", "altids": {"mosaic": "8581536e-f30b-4608-8421-d9f96dcbeabf", "story": "42d539c8-1ff0-44a6-a4d9-afd52bc31b87", "slug": "linia-electrica-vulcanesti-chisinau-a-fost-pusa-sub-tensiune"}, "subject": [{"name": "Energy", "rel": "direct", "literal": "energy", "code": "medtop:20000418", "scheme": "http://cv.iptc.org/newscodes/mediatopic/", "uri": "http://cv.iptc.org/newscodes/mediatopic/20000418"}], "place": [{"name": "Moldova", "literal": "md", "code": "MD", "scheme": "http://cv.iptc.org/newscodes/countrycodes/"}], "person": [], "organisation": [], "genre": [{"name": "Updated story", "literal": "update"}], "service": [{"name": "Wireva", "literal": "wireva"}], "associations": {"featuremedia": {"uri": "urn:newsml:wireva.mib.news:media:c855f91d-ecea-4ab0-9d42-ed05a9f9c0c1", "type": "picture", "version": "1", "pubstatus": "usable", "headline": "Linia Vulcănești–Chișinău, pusă sub tensiune. Maia Sandu: „Nimeni nu ne mai poate șantaja, stinge lumina și închide căldura”", "description_text": "", "copyrightholder": "moldova1.md", "copyrightnotice": "moldova1.md", "usageterms": "No machine-readable licence: address and terms are delivered, the file is not.", "altids": {"wireva": "c855f91d-ecea-4ab0-9d42-ed05a9f9c0c1"}, "extra": {"wireva:delivery_mode": "link_only", "wireva:rights": {"licence": "", "licence_url": "", "licence_raw": "source feed — rights of the originating publisher", "licence_verified_at": "2026-11-09T13:00:42.532575Z", "attribution_required": true, "attribution_text": "moldova1.md", "redistribution_allowed": false, "commercial_use_allowed": false, "modifications_allowed": false, "share_alike_required": false}, "wireva:provenance": {"creator": "", "source_name": "moldova1.md", "source_url": "https://moldova1.md/p/89698/linia-vulcanesti-chisinau-pusa-sub-tensiune-maia-sandu--nimeni-nu-ne-mai-poate-santaja-stinge-lumina-si-inchide-caldura-", "source_page_url": "https://moldova1.md/p/89698/linia-vulcanesti-chisinau-pusa-sub-tensiune-maia-sandu--nimeni-nu-ne-mai-poate-santaja-stinge-lumina-si-inchide-caldura-", "our_page_url": "https://cronicamoldovei.com/economie/linia-electrica-vulcanesti-chisinau-a-fost-pusa-sub-tensiune/"}, "wireva:role": "lead"}, "renditions": {"source": {"href": "https://moldova1.md/p/89698/linia-vulcanesti-chisinau-pusa-sub-tensiune-maia-sandu--nimeni-nu-ne-mai-poate-santaja-stinge-lumina-si-inchide-caldura-", "mimetype": "image/jpeg"}}}}, "extra": {"wireva:story": {"uri": "urn:newsml:wireva.mib.news:story:42d539c8-1ff0-44a6-a4d9-afd52bc31b87", "slug": "maia-sandu-moldova-isi-propune-sa-incheie-negocierile-de-aderare-la-ue-pana-la-inceputul-anului-2028-20261109", "status": "updated", "languages": ["ro"], "item_count": 7, "is_breaking": false}, "wireva:rights": {"class": "agency_original", "redistribution_allowed": true, "commercial_use_allowed": true, "modifications_allowed": true, "share_alike_required": false, "attribution_required": true, "attribution_text": "Wireva / Cronica Moldovei de Azi", "canonical_required": true, "canonical_url": "https://cronicamoldovei.com/economie/linia-electrica-vulcanesti-chisinau-a-fost-pusa-sub-tensiune/", "linkback_required": true, "licence": "Wireva subscriber licence", "licence_url": "", "licensor": "Haydamax OÜ", "valid_until": null, "excerpt_max_chars": 0, "decided_by_rule": "agency_original_unassessed_allow", "needs_review": true}, "wireva:provenance": {"production_method": "automated", "ai_stages": {}, "model": "", "human_reviewed": false, "reviewed_by": "", "reviewed_at": null, "editorial_control": true, "editorial_responsibility": "Haydamax OÜ (Wireva)", "factchecked": false, "verification_status": "multi_source", "independent_confirmations": 1, "official_source_used": false, "used_press_release": false, "public_interest": true, "ai_disclosure_required": true, "ai_disclosure_text": "Acest material a fost realizat cu ajutorul IA sub responsabilitatea editorială a Haydamax OÜ.", "independence_check": {"status": "not_assessed", "score": 0.0, "checked_at": "2026-11-09T13:00:42.529552Z"}}, "wireva:publication": {"name": "Cronica Moldovei de Azi", "domain": "cronicamoldovei.com", "country": "MD", "url": "https://cronicamoldovei.com/economie/linia-electrica-vulcanesti-chisinau-a-fost-pusa-sub-tensiune/"}, "wireva:links": {"self": "https://wireva.mib.news/api/v1/items/8581536e-f30b-4608-8421-d9f96dcbeabf", "html": "https://wireva.mib.news/item/8581536e-f30b-4608-8421-d9f96dcbeabf/linia-electrica-vulcanesti-chisinau-a-fost-pusa-sub-tensiune/", "story": "https://wireva.mib.news/story/maia-sandu-moldova-isi-propune-sa-incheie-negocierile-de-aderare-la-ue-pana-la-inceputul-anului-2028-20261109/"}, "wireva:metrics": {"word_count": 530, "char_count": 3564, "reading_time_seconds": 255}}}