{"$schema": "https://iptc.org/std/ninjs/ninjs-schema_3.2.json", "uri": "urn:newsml:wireva.mib.news:item:b5b4fd72-1fd6-4d7d-bc83-6735190c7933", "type": "text", "profile": "update", "version": "1", "versioncreated": "2026-11-13T10:10:39.946006Z", "firstcreated": "2026-11-13T10:10:22.887538Z", "pubstatus": "usable", "urgency": 5, "language": "en", "headline": "Alberta building trades back federal-provincial west coast pipeline deal", "byline": "", "located": "CA", "copyrightholder": "Haydamax OÜ", "copyrightnotice": "Wireva / The Canadian Public Chronicle", "usageterms": "Subscribers may republish this item in full, including translation and trimming, with the credit “Wireva / The Canadian Public Chronicle”. Set rel=canonical to https://canadianchronicle.com/politics/alberta-building-trades-back-federal-provincial-west-coast-pipeline-deal/ when publishing on the web.", "description_text": "The Building Trades of Alberta, which says it represents 60,000 members, has endorsed a proposed west coast oil pipeline to British Columbia's coast that Prime Minister Mark Carney and Premier Danielle Smith announced as a federal-provincial partnership.", "altids": {"mosaic": "b5b4fd72-1fd6-4d7d-bc83-6735190c7933", "story": "1e6617b7-82cc-4f53-9476-0a65a937f3ab", "slug": "alberta-building-trades-back-federal-provincial-west-coast-pipeline-deal"}, "subject": [{"name": "Politics", "rel": "direct", "literal": "politics", "code": "medtop:11000000", "scheme": "http://cv.iptc.org/newscodes/mediatopic/", "uri": "http://cv.iptc.org/newscodes/mediatopic/11000000"}], "place": [{"name": "CA", "literal": "ca", "code": "CA", "scheme": "http://cv.iptc.org/newscodes/countrycodes/"}], "person": [], "organisation": [], "genre": [{"name": "Updated story", "literal": "update"}], "service": [{"name": "Wireva", "literal": "wireva"}], "associations": {"featuremedia": {"uri": "urn:newsml:wireva.mib.news:media:d3b90169-b00e-4158-b510-9124135f1735", "type": "picture", "version": "1", "pubstatus": "usable", "headline": "Alberta’s Building Trades Are Ready to Build Canada’s Next Nation-Building Pipeline", "description_text": "Alberta building trades back federal-provincial west coast pipeline deal", "copyrightholder": "bta.ca", "copyrightnotice": "Alberta’s Building Trades Are Ready to Build Canada’s Next Nation-Building Pipeline", "usageterms": "Picture belongs to the source publication: address and terms are delivered, the file is not.", "altids": {"wireva": "d3b90169-b00e-4158-b510-9124135f1735"}, "extra": {"wireva:delivery_mode": "link_only", "wireva:rights": {"licence": "", "licence_url": "", "licence_raw": "RSS source", "licence_verified_at": "2026-11-13T10:10:39.964145Z", "attribution_required": true, "attribution_text": "Alberta’s Building Trades Are Ready to Build Canada’s Next Nation-Building Pipeline", "redistribution_allowed": false, "commercial_use_allowed": false, "modifications_allowed": false, "share_alike_required": false}, "wireva:provenance": {"creator": "", "source_name": "bta.ca", "source_url": "https://bta.ca/wp-content/uploads/2026/07/IMG_5928-edited-scaled.jpeg", "source_page_url": "https://bta.ca/wp-content/uploads/2026/07/IMG_5928-edited-scaled.jpeg", "our_page_url": "https://canadianchronicle.com/politics/alberta-building-trades-back-federal-provincial-west-coast-pipeline-deal/"}, "wireva:role": "lead"}, "renditions": {"source": {"href": "https://bta.ca/wp-content/uploads/2026/07/IMG_5928-edited-scaled.jpeg", "mimetype": "image/jpeg"}}}}, "extra": {"wireva:story": {"uri": "urn:newsml:wireva.mib.news:story:1e6617b7-82cc-4f53-9476-0a65a937f3ab", "slug": "ottawa-unveils-budget-2026-with-1511b-in-new-investments-20261110", "status": "closed", "languages": ["en"], "item_count": 16, "is_breaking": false}, "wireva:rights": {"class": "agency_original", "redistribution_allowed": false, "commercial_use_allowed": false, "modifications_allowed": true, "share_alike_required": false, "attribution_required": true, "attribution_text": "Wireva / The Canadian Public Chronicle", "canonical_required": true, "canonical_url": "https://canadianchronicle.com/politics/alberta-building-trades-back-federal-provincial-west-coast-pipeline-deal/", "linkback_required": true, "licence": "", "licence_url": "", "licensor": "Haydamax OÜ", "valid_until": null, "excerpt_max_chars": 0, "decided_by_rule": "agency_original_borderline", "needs_review": true}, "wireva:provenance": {"production_method": "automated", "ai_stages": {"editing": true, "drafting": true, "headline": true, "discovery": true, "classification": true, "image_selection": true, "source_collection": true, "cross_source_comparison": true}, "model": "", "human_reviewed": false, "reviewed_by": "", "reviewed_at": null, "editorial_control": true, "editorial_responsibility": "Haydamax OÜ (Wireva)", "factchecked": false, "verification_status": "single_source", "independent_confirmations": 0, "official_source_used": false, "used_press_release": false, "public_interest": true, "ai_disclosure_required": true, "ai_disclosure_text": "This item was produced with AI assistance under the editorial responsibility of Haydamax OÜ.", "independence_check": {"status": "borderline", "score": 0.457, "checked_at": "2026-11-13T10:10:39.960689Z"}}, "wireva:publication": {"name": "The Canadian Public Chronicle", "domain": "canadianchronicle.com", "country": "CA", "url": "https://canadianchronicle.com/politics/alberta-building-trades-back-federal-provincial-west-coast-pipeline-deal/"}, "wireva:links": {"self": "https://wireva.mib.news/api/v1/items/b5b4fd72-1fd6-4d7d-bc83-6735190c7933", "html": "https://wireva.mib.news/item/b5b4fd72-1fd6-4d7d-bc83-6735190c7933/alberta-building-trades-back-federal-provincial-west-coast-pipeline-deal/", "story": "https://wireva.mib.news/story/ottawa-unveils-budget-2026-with-1511b-in-new-investments-20261110/"}, "wireva:metrics": {"word_count": 386, "char_count": 2571, "reading_time_seconds": 184}}}