{"$schema": "https://iptc.org/std/ninjs/ninjs-schema_3.2.json", "uri": "urn:newsml:wireva.mib.news:item:bf11a3ac-8fca-4c27-89b3-e3cd1dd33a38", "type": "text", "profile": "standard", "version": "1", "versioncreated": "2026-10-20T12:05:17.449102Z", "firstcreated": "2026-10-20T12:00:59.363349Z", "pubstatus": "usable", "urgency": 5, "language": "nl", "headline": "Honda en Taisei testen draadloos laden tijdens het rijden tot 150 kW", "byline": "Eva Smit", "located": "Netherlands", "copyrightholder": "Haydamax OÜ", "copyrightnotice": "Wireva / Rijblik", "usageterms": "Subscribers may republish this item in full, including translation and trimming, with the credit “Wireva / Rijblik”. Set rel=canonical to https://rijblik.mib.news/elektrisch-rijden/honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw/ when publishing on the web.", "description_text": "Honda heeft samen met bouwbedrijf Taisei technologie ontwikkeld om elektrische voertuigen tijdens het rijden draadloos op te laden, met een vermogen tot 150 kW. De eerste tests op een proefweg beginnen dit jaar.", "altids": {"mosaic": "bf11a3ac-8fca-4c27-89b3-e3cd1dd33a38", "story": "54bb7dae-fc67-412a-a050-108e47a1f3f1", "slug": "honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw"}, "subject": [{"name": "Mobility and motoring", "rel": "direct", "literal": "auto", "code": "medtop:20000350", "scheme": "http://cv.iptc.org/newscodes/mediatopic/", "uri": "http://cv.iptc.org/newscodes/mediatopic/20000350"}], "place": [{"name": "Netherlands", "literal": "nl", "code": "NL", "scheme": "http://cv.iptc.org/newscodes/countrycodes/"}], "person": [], "organisation": [], "genre": [{"name": "Standard story", "literal": "standard"}], "service": [{"name": "Wireva", "literal": "wireva"}], "associations": {"featuremedia": {"uri": "urn:newsml:wireva.mib.news:media:65271e84-edaf-48cc-8cf7-e10e38091ca1", "type": "picture", "version": "1", "pubstatus": "usable", "headline": "1983 Honda CB1100F Super Bol d’Or at No Reserve", "description_text": "Honda en Taisei testen draadloos laden tijdens het rijden tot 150 kW", "copyrightholder": "bringatrailer.com", "copyrightnotice": "1983 Honda CB1100F Super Bol d’Or at No Reserve", "usageterms": "Picture belongs to the source publication: address and terms are delivered, the file is not.", "altids": {"wireva": "65271e84-edaf-48cc-8cf7-e10e38091ca1"}, "extra": {"wireva:delivery_mode": "link_only", "wireva:rights": {"licence": "", "licence_url": "", "licence_raw": "Related RSS source", "licence_verified_at": "2026-10-20T12:05:17.466318Z", "attribution_required": true, "attribution_text": "1983 Honda CB1100F Super Bol d’Or at No Reserve", "redistribution_allowed": false, "commercial_use_allowed": false, "modifications_allowed": false, "share_alike_required": false}, "wireva:provenance": {"creator": "", "source_name": "bringatrailer.com", "source_url": "https://bringatrailer.com/listing/1983-honda-cb1100f-super-bol-dor/", "source_page_url": "https://bringatrailer.com/listing/1983-honda-cb1100f-super-bol-dor/", "our_page_url": "https://rijblik.mib.news/elektrisch-rijden/honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw/"}, "wireva:role": "lead"}, "renditions": {"source": {"href": "https://bringatrailer.com/listing/1983-honda-cb1100f-super-bol-dor/", "mimetype": "image/jpeg"}}}}, "extra": {"wireva:story": {"uri": "urn:newsml:wireva.mib.news:story:54bb7dae-fc67-412a-a050-108e47a1f3f1", "slug": "honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw-20261020", "status": "developing", "languages": ["nl"], "item_count": 1, "is_breaking": false}, "wireva:rights": {"class": "agency_original", "redistribution_allowed": true, "commercial_use_allowed": true, "modifications_allowed": true, "share_alike_required": false, "attribution_required": true, "attribution_text": "Wireva / Rijblik", "canonical_required": true, "canonical_url": "https://rijblik.mib.news/elektrisch-rijden/honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw/", "linkback_required": true, "licence": "Wireva subscriber licence", "licence_url": "", "licensor": "Haydamax OÜ", "valid_until": null, "excerpt_max_chars": 0, "decided_by_rule": "agency_original_verified", "needs_review": false}, "wireva:provenance": {"production_method": "automated", "ai_stages": {"editing": true, "drafting": true, "headline": true, "discovery": true, "classification": true, "image_selection": true, "source_collection": true, "cross_source_comparison": true}, "model": "", "human_reviewed": false, "reviewed_by": "", "reviewed_at": null, "editorial_control": true, "editorial_responsibility": "Haydamax OÜ (Wireva)", "factchecked": false, "verification_status": "multi_source", "independent_confirmations": 1, "official_source_used": false, "used_press_release": false, "public_interest": false, "ai_disclosure_required": false, "ai_disclosure_text": "", "independence_check": {"status": "passed", "score": 0.007, "checked_at": "2026-10-20T12:05:17.463266Z"}}, "wireva:publication": {"name": "Rijblik", "domain": "rijblik.mib.news", "country": "NL", "url": "https://rijblik.mib.news/elektrisch-rijden/honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw/"}, "wireva:links": {"self": "https://wireva.mib.news/api/v1/items/bf11a3ac-8fca-4c27-89b3-e3cd1dd33a38", "html": "https://wireva.mib.news/item/bf11a3ac-8fca-4c27-89b3-e3cd1dd33a38/honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw/", "story": "https://wireva.mib.news/story/honda-en-taisei-testen-draadloos-laden-tijdens-het-rijden-tot-150-kw-20261020/"}, "wireva:metrics": {"word_count": 415, "char_count": 2856, "reading_time_seconds": 204}}}