{"$schema": "https://iptc.org/std/ninjs/ninjs-schema_3.2.json", "uri": "urn:newsml:wireva.mib.news:item:d6993884-661b-488b-ad98-b43a808f190e", "type": "text", "profile": "standard", "version": "1", "versioncreated": "2026-08-23T16:08:33.836001Z", "firstcreated": "2026-08-23T16:05:54.270681Z", "pubstatus": "usable", "urgency": 5, "language": "en", "headline": "Data Centres Under Construction Will Emit as Much CO2 as 24 Million Cars", "byline": "Edward Beaumont", "located": "United Kingdom", "copyrightholder": "Haydamax OÜ", "copyrightnotice": "Wireva / Nobel", "usageterms": "Subscribers may republish this item in full, including translation and trimming, with the credit “Wireva / Nobel”. Set rel=canonical to https://nobel.observer/technology/data-centres-under-construction-will-emit-as-much-co2-as-24-million-cars/ when publishing on the web.", "description_text": "New analysis finds that data centres currently under construction will produce carbon emissions equivalent to 24 million cars, raising concerns about the environmental cost of the AI and cloud computing boom.", "altids": {"mosaic": "d6993884-661b-488b-ad98-b43a808f190e", "story": "e3f5d7b6-e461-4690-b0ba-689441580ed0", "slug": "data-centres-under-construction-will-emit-as-much-co2-as-24-million-cars"}, "subject": [{"name": "Technology", "rel": "direct", "literal": "technology", "code": "medtop:13000000", "scheme": "http://cv.iptc.org/newscodes/mediatopic/", "uri": "http://cv.iptc.org/newscodes/mediatopic/13000000"}], "place": [{"name": "United Kingdom", "literal": "gb", "code": "GB", "scheme": "http://cv.iptc.org/newscodes/countrycodes/"}], "person": [], "organisation": [], "genre": [{"name": "Standard story", "literal": "standard"}], "service": [{"name": "Wireva", "literal": "wireva"}], "associations": {"featuremedia": {"uri": "urn:newsml:wireva.mib.news:media:7094aa21-4796-44fb-9043-6fe1fb086627", "type": "picture", "version": "1", "pubstatus": "usable", "headline": "Analysis Shows All Those Data Centers Under Construction Will Output As Much CO2 As 24 Million Cars", "description_text": "Data Centres Under Construction Will Emit as Much CO2 as 24 Million Cars", "copyrightholder": "jalopnik.com", "copyrightnotice": "Analysis Shows All Those Data Centers Under Construction Will Output As Much CO2 As 24 Million Cars", "usageterms": "Picture belongs to the source publication: address and terms are delivered, the file is not.", "altids": {"wireva": "7094aa21-4796-44fb-9043-6fe1fb086627"}, "extra": {"wireva:delivery_mode": "link_only", "wireva:rights": {"licence": "", "licence_url": "", "licence_raw": "RSS source", "licence_verified_at": "2026-08-23T16:08:33.847272Z", "attribution_required": true, "attribution_text": "Analysis Shows All Those Data Centers Under Construction Will Output As Much CO2 As 24 Million Cars", "redistribution_allowed": false, "commercial_use_allowed": false, "modifications_allowed": false, "share_alike_required": false}, "wireva:provenance": {"creator": "", "source_name": "jalopnik.com", "source_url": "https://www.jalopnik.com/img/gallery/analysis-shows-all-those-data-centers-under-construction-will-output-as-much-co2-as-24-million-cars/l-intro-1787248790.jpg", "source_page_url": "https://www.jalopnik.com/img/gallery/analysis-shows-all-those-data-centers-under-construction-will-output-as-much-co2-as-24-million-cars/l-intro-1787248790.jpg", "our_page_url": "https://nobel.observer/technology/data-centres-under-construction-will-emit-as-much-co2-as-24-million-cars/"}, "wireva:role": "lead"}, "renditions": {"source": {"href": "https://www.jalopnik.com/img/gallery/analysis-shows-all-those-data-centers-under-construction-will-output-as-much-co2-as-24-million-cars/l-intro-1787248790.jpg", "mimetype": "image/jpeg"}}}}, "extra": {"wireva:story": {"uri": "urn:newsml:wireva.mib.news:story:e3f5d7b6-e461-4690-b0ba-689441580ed0", "slug": "outer-banks-un-prequel-en-preparation-chez-netflix-20260821", "status": "closed", "languages": ["de", "en", "es", "fr", "nl", "uk"], "item_count": 39, "is_breaking": false}, "wireva:rights": {"class": "agency_original", "redistribution_allowed": true, "commercial_use_allowed": true, "modifications_allowed": true, "share_alike_required": false, "attribution_required": true, "attribution_text": "Wireva / Nobel", "canonical_required": true, "canonical_url": "https://nobel.observer/technology/data-centres-under-construction-will-emit-as-much-co2-as-24-million-cars/", "linkback_required": true, "licence": "Wireva subscriber licence", "licence_url": "", "licensor": "Haydamax OÜ", "valid_until": null, "excerpt_max_chars": 0, "decided_by_rule": "agency_original_verified", "needs_review": false}, "wireva:provenance": {"production_method": "automated", "ai_stages": {"editing": true, "drafting": true, "headline": true, "discovery": true, "classification": true, "image_selection": true, "source_collection": true, "cross_source_comparison": true}, "model": "", "human_reviewed": false, "reviewed_by": "", "reviewed_at": null, "editorial_control": true, "editorial_responsibility": "Haydamax OÜ (Wireva)", "factchecked": false, "verification_status": "multi_source", "independent_confirmations": 2, "official_source_used": false, "used_press_release": false, "public_interest": false, "ai_disclosure_required": false, "ai_disclosure_text": "", "independence_check": {"status": "passed", "score": 0.072, "checked_at": "2026-08-23T16:08:33.845121Z"}}, "wireva:publication": {"name": "Nobel", "domain": "nobel.observer", "country": "GB", "url": "https://nobel.observer/technology/data-centres-under-construction-will-emit-as-much-co2-as-24-million-cars/"}, "wireva:links": {"self": "https://wireva.mib.news/api/v1/items/d6993884-661b-488b-ad98-b43a808f190e", "html": "https://wireva.mib.news/item/d6993884-661b-488b-ad98-b43a808f190e/data-centres-under-construction-will-emit-as-much-co2-as-24-million-cars/", "story": "https://wireva.mib.news/story/outer-banks-un-prequel-en-preparation-chez-netflix-20260821/"}, "wireva:metrics": {"word_count": 465, "char_count": 3122, "reading_time_seconds": 223}}}