{"$schema": "https://iptc.org/std/ninjs/ninjs-schema_3.2.json", "uri": "urn:newsml:wireva.mib.news:story:a2f60009-3c87-4dc4-b2ae-db122f666696", "type": "composite", "version": "1", "versioncreated": "2026-11-22T08:35:10.933180Z", "firstcreated": "2026-11-22T08:35:10.933180Z", "pubstatus": "usable", "language": "en", "headline": "Romanian road authority readies TBM to bore Poiana tunnel on Sibiu-Pitești motorway", "description_text": "The tunnel boring machine for the 1,780-metre Poiana tunnel on the Sibiu-Pitești motorway is nearly fully assembled, with one oversized transport still to arrive. Works on the Cornetu-Tigveni section stand at 18.89 per cent physical progress.", "associations": {"item-0": {"$schema": "https://iptc.org/std/ninjs/ninjs-schema_3.2.json", "uri": "urn:newsml:wireva.mib.news:item:bcc3fc3b-26a7-4c29-919e-91e0a62490ca", "type": "text", "profile": "standard", "version": "1", "versioncreated": "2026-11-22T08:35:42.459659Z", "firstcreated": "2026-11-22T08:35:10.933180Z", "pubstatus": "usable", "urgency": 5, "language": "en", "headline": "Romanian road authority readies TBM to bore Poiana tunnel on Sibiu-Pitești motorway", "byline": "Bethany Hadley", "located": "United Kingdom", "copyrightholder": "Haydamax OÜ", "copyrightnotice": "Wireva / Hublcore", "usageterms": "Subscribers may republish this item in full, including translation and trimming, with the credit “Wireva / Hublcore”. Set rel=canonical to https://hublcore.com/economy/romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway/ when publishing on the web.", "description_text": "The tunnel boring machine for the 1,780-metre Poiana tunnel on the Sibiu-Pitești motorway is nearly fully assembled, with one oversized transport still to arrive. Works on the Cornetu-Tigveni section stand at 18.89 per cent physical progress.", "altids": {"mosaic": "bcc3fc3b-26a7-4c29-919e-91e0a62490ca", "story": "a2f60009-3c87-4dc4-b2ae-db122f666696", "slug": "romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway"}, "subject": [{"name": "Economy and business", "rel": "direct", "literal": "economy", "code": "medtop:04000000", "scheme": "http://cv.iptc.org/newscodes/mediatopic/", "uri": "http://cv.iptc.org/newscodes/mediatopic/04000000"}], "place": [{"name": "United Kingdom", "literal": "gb", "code": "GB", "scheme": "http://cv.iptc.org/newscodes/countrycodes/"}], "person": [], "organisation": [], "genre": [{"name": "Standard story", "literal": "standard"}], "service": [{"name": "Wireva", "literal": "wireva"}], "associations": {"featuremedia": {"uri": "urn:newsml:wireva.mib.news:media:709d3fe5-3edf-4518-a32f-b62fd8bd0659", "type": "picture", "version": "1", "pubstatus": "usable", "headline": "FOTO | Autostrada Sibiu – Pitești: Montajul „cârtiței” care va fora tunelul Poiana durează trei luni / Peste 100 de transporturi sunt necesare pentru aducerea componentelor pe șantier", "description_text": "Tunnelling machine for Poiana tunnel on Sibiu–Pitești motorway reaches site", "copyrightholder": "economedia.ro", "copyrightnotice": "FOTO | Autostrada Sibiu – Pitești: Montajul „cârtiței” care va fora tunelul Poiana durează trei luni / Peste 100 de transporturi sunt necesare pentru aducerea componentelor pe șantier", "usageterms": "Picture belongs to the source publication: address and terms are delivered, the file is not.", "altids": {"wireva": "709d3fe5-3edf-4518-a32f-b62fd8bd0659"}, "extra": {"wireva:delivery_mode": "link_only", "wireva:rights": {"licence": "", "licence_url": "", "licence_raw": "RSS source", "licence_verified_at": "2026-11-22T08:35:42.521124Z", "attribution_required": true, "attribution_text": "FOTO | Autostrada Sibiu – Pitești: Montajul „cârtiței” care va fora tunelul Poiana durează trei luni / Peste 100 de transporturi sunt necesare pentru aducerea componentelor pe șantier", "redistribution_allowed": false, "commercial_use_allowed": false, "modifications_allowed": false, "share_alike_required": false}, "wireva:provenance": {"creator": "", "source_name": "economedia.ro", "source_url": "https://www.economedia.ro/wp-content/uploads/2026/10/TBM-Poiana-Autostrada-Sibiu-Pitesti-2-1024x576.jpeg", "source_page_url": "https://www.economedia.ro/wp-content/uploads/2026/10/TBM-Poiana-Autostrada-Sibiu-Pitesti-2-1024x576.jpeg", "our_page_url": "https://hublcore.com/economy/romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway/"}, "wireva:role": "lead"}, "renditions": {"source": {"href": "https://www.economedia.ro/wp-content/uploads/2026/10/TBM-Poiana-Autostrada-Sibiu-Pitesti-2-1024x576.jpeg", "mimetype": "image/jpeg"}}}}, "extra": {"wireva:story": {"uri": "urn:newsml:wireva.mib.news:story:a2f60009-3c87-4dc4-b2ae-db122f666696", "slug": "romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway-20261122", "status": "developing", "languages": ["en"], "item_count": 1, "is_breaking": false}, "wireva:rights": {"class": "agency_original", "redistribution_allowed": true, "commercial_use_allowed": true, "modifications_allowed": true, "share_alike_required": false, "attribution_required": true, "attribution_text": "Wireva / Hublcore", "canonical_required": true, "canonical_url": "https://hublcore.com/economy/romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway/", "linkback_required": true, "licence": "Wireva subscriber licence", "licence_url": "", "licensor": "Haydamax OÜ", "valid_until": null, "excerpt_max_chars": 0, "decided_by_rule": "agency_original_verified", "needs_review": false}, "wireva:provenance": {"production_method": "automated", "ai_stages": {"editing": true, "drafting": true, "headline": true, "discovery": true, "classification": true, "image_selection": true, "source_collection": true, "cross_source_comparison": true}, "model": "", "human_reviewed": false, "reviewed_by": "", "reviewed_at": null, "editorial_control": true, "editorial_responsibility": "Haydamax OÜ (Wireva)", "factchecked": false, "verification_status": "single_source", "independent_confirmations": 0, "official_source_used": false, "used_press_release": false, "public_interest": true, "ai_disclosure_required": true, "ai_disclosure_text": "This item was produced with AI assistance under the editorial responsibility of Haydamax OÜ.", "independence_check": {"status": "passed", "score": 0.155, "checked_at": "2026-11-22T08:35:42.512761Z"}, "sources": [{"url": "https://economedia.ro/video-autostrada-sibiu-pitesti-cartita-care-va-fora-tunelul-poiana-prinde-contur-un-singur-transport-agabaritic-ramas.html", "title": "VIDEO | Autostrada Sibiu – Pitești. Cârtița care va fora tunelul Poiana prinde contur. Un singur transport agabaritic rămas", "publisher": "economedia.ro", "type": "rss", "role": "primary", "official": false, "retrieved_at": "2026-11-22T08:35:42.477350Z", "published_at": "2026-11-22T07:12:22Z"}]}, "wireva:publication": {"name": "Hublcore", "domain": "hublcore.com", "country": "GB", "url": "https://hublcore.com/economy/romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway/"}, "wireva:links": {"self": "https://wireva.mib.news/api/v1/items/bcc3fc3b-26a7-4c29-919e-91e0a62490ca", "html": "https://wireva.mib.news/item/bcc3fc3b-26a7-4c29-919e-91e0a62490ca/romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway/", "story": "https://wireva.mib.news/story/romanian-road-authority-readies-tbm-to-bore-poiana-tunnel-on-sibiu-pitesti-motorway-20261122/"}, "wireva:metrics": {"word_count": 492, "char_count": 3022, "reading_time_seconds": 216}}}}, "extra": {"wireva:languages": ["en"], "wireva:status": "developing", "wireva:item_count": 1}}