St Lucia has launched the Ninth Water Project, a US$22.83 million initiative to replace the John Compton Dam raw water pipeline and reduce disruptions caused by ageing infrastructure.
St Lucia Launches US$22.83 Million Water Project to Strengthen Supply
St Lucia has launched the Ninth Water Project, a US$22.83 million initiative to replace the John Compton Dam raw water pipeline and reduce disruptions caused by ageing infrastructure.
Doc Searls · CC BY-SA 2.0 · rights
This item was produced with AI assistance under the editorial responsibility of Haydamax OÜ.
Monitoring item. The full text is not distributed. Extract and source below.