Wireva

St Lucia Launches US$22.83 Million Water Project to Strengthen Supply

St Lucia has launched the Ninth Water Project, a US$22.83 million initiative to replace the John Compton Dam raw water pipeline and reduce disruptions caused by ageing infrastructure.

St Lucia launches US$22.83 million project to strengthen water supply
St Lucia Launches US$22.83 Million Water Project to Strengthen Supply
Doc Searls · CC BY-SA 2.0 · rights

This item was produced with AI assistance under the editorial responsibility of Haydamax OÜ.

Monitoring item. The full text is not distributed. Extract and source below.

St Lucia has launched the Ninth Water Project, a US$22.83 million initiative to replace the John Compton Dam raw water pipeline and reduce disruptions caused by ageing infrastructure.