Wireva

Astranis upgrades Falcon 9 contract to dedicated mission for Block 4 satellites

Astranis has converted its fourth launch on a SpaceX Falcon 9 into a dedicated mission carrying the entire Block 4 production run of its satellites, with liftoff planned for 2028.

Monitoring item. The full text is not distributed. Extract and source below.

Astranis has converted its fourth launch on a SpaceX Falcon 9 into a dedicated mission carrying the entire Block 4 production run of its satellites, with liftoff planned for 2028.