Astranis has converted its fourth launch on a SpaceX Falcon 9 into a dedicated mission carrying the entire Block 4 production run of its satellites, with liftoff planned for 2028.
Astranis upgrades Falcon 9 contract to dedicated mission for Block 4 satellites
Astranis has converted its fourth launch on a SpaceX Falcon 9 into a dedicated mission carrying the entire Block 4 production run of its satellites, with liftoff planned for 2028.
Monitoring item. The full text is not distributed. Extract and source below.