Wireva

What Nepal’s day of mourning does not end

The 13th day after the floods brought national mourning, but rescue teams and families are still confronting thousands of missing people and blocked hydropower tunnels.

Nepal’s 13th day of mourning arrives before grief can fully begin

Bijay Chaurasia / Wikimedia Commons · Wikimedia — licence per file · rights

This item was produced with AI assistance under the editorial responsibility of Haydamax OÜ.

Nepal’s official day of mourning arrived on the 13th day after the August 26 floods, matching a traditional Hindu mourning period. It did not bring an end to the emergency.

More than 1,300 people have died across Nepal and Tibet, while about 5,000 remain missing, including foreign nationals. Government offices lowered flags Monday and families carried out final mourning rituals. Yet the country’s rescue system is still concentrated on a set of sites where the uncertainty is especially acute: 12 damaged hydropower projects.

Authorities say about 900 workers from those projects are missing and roughly 500 are believed to be trapped in tunnels. Those numbers are estimates, not a confirmed count of survivors underground. They help explain why specialised crews are spending precious time opening passages choked with mud, boulders and wreckage.

Two Nepali workers were rescued from the Trishuli 3A tunnel nine days after the flooding. A Chinese worker was pulled from another tunnel the next day. Those rescues renewed hope, but they also highlighted the technical difficulty of the work. Access roads were damaged, tunnel entrances disappeared under debris and some underground sections filled with mud and water.

Nepal has brought in help from India, China, South Korea and the United States. The national response is also dealing with problems outside the hydropower sites. The Foreign Ministry says houses, roads, bridges and critical infrastructure were damaged across Rasuwa, Nuwakot, Dhading and other districts. Thousands of displaced people have been staying in relief centres, while some communities remain difficult to reach.

The human pressure is now visible in Kathmandu. Relatives of missing hydropower workers have protested near the prime minister’s office and ministries, arguing that search operations must move faster. Many are caught between two realities: the formal calendar of mourning has reached its final day, but they still do not know whether to grieve or wait for a rescue.

That tension is particularly painful in Nepal’s Hindu tradition, where cremation is an important final rite. Associated Press reporting says some families without recovered bodies have performed symbolic funerals. The ceremonies can offer a measure of spiritual closure, but they cannot resolve the practical uncertainty of a missing-person case.

The flood itself is believed to have been triggered by a glacier collapse, though reporting continues to describe that causal chain as likely rather than finally established. The distinction matters because a disaster of this scale will eventually require more than rebuilding. Authorities and engineers will have to examine where workers were located, how tunnels were accessed, what warning systems existed and whether rescue equipment could reach remote construction sites quickly enough.

For now, the key metric is not the mourning calendar but access. Every cleared road, opened tunnel and verified missing-person list changes what rescuers can do next. Nepal has reached the end of 13 days of ritual mourning while the operational emergency remains very much alive.

Same event, other desks

Story file →